Owner Builder
The Process
​
At ​​Caruso designs we provide a service to our clients wanting to become an Owner Builder.
We guide you through the OB application process, prepare drawings, documents,
certifications, and submit your Building Permit.
We offer costing spreadsheets, selection-pre start, and connect you with suppliers-trades as needed.
Additionally, we design, manufacture, and deliver our own steel framing.
​
​​​​​
FOUR (4) SIMPLE STEPS TO APPLY
​
* White card course online (link below)
(45 min online multiple choice)
* OB online course relevant to WA (link below)
(30 min multiple choice)
​
​​​​​
​
​​
* Architectural working drawings & Certified Structural engineering
​​​​​​
* Once all documents above are complete, apply online (link below) FORM 75 Owner Builder approval
the whole submission process usually takes 6-8 weeks
​​
​
​​​
​
​​​​​​We understand the construction industry is struggling with demand. to provide all the required
documents and certifications for an easy Building Permit application.
​​
​
​
​
​​
​​​​​​